Saturday morning 09:30, a knock at the patio door. Our cable operator is facing the door, "armed" with tools and coaxial cable. "If you have time and I could help you in one hour, the cable TV in the house." No sooner said than done! Feeder band to the empty tube, coax attached equipment room of the house and pulled into the distribution box connected and mounted in the HT room transition piece and the "multimedia table" attached.

Friday, December 21, 2007

Is It Ok To Wear Lipstick Everyday

porch steps

Friday before the Christmas holidays. Our builders are gas. Veranda stripping, stair shuttering, shaft for the exhaust system shells and then concrete. Closing time and into the deserved vacation.

Wednesday, December 19, 2007

Melina Velba Lesbisch

Do not freeze!

A beautiful day! On the morning of our exhaust system was installed. In the afternoon came the "nice man" by Elco and the gas heater was put into operation.

We have warm again in our house.
(heating was taken out of service during the summer holidays)

Tuesday, December 18, 2007

The Meaning Of A Wedding Cake Being Cut

building services

started yesterday Monday Mäsi Pfister of heating systems with an installation of our new heating system. At the same time Roger also installed the new water distribution and said the boiler of the laundry room in the building equipment room.


made at the same time, the team of Kurt and Marcel the formwork for our porch. The concrete pump started up again and the porch was poured.

Saturday, December 15, 2007

Decorative Wax Strips

first ascent

first ascent of the virgin concrete by our boys.

Friday, December 14, 2007

Simple Comfort2001 Thermostat

concrete pump

Today 07: 00 were concreted the foundations.


Thursday, December 13, 2007

How To Record Ontario Immunization Record

pickles


In the meantime, our builder the lean concrete is introduced as a cleaning layer of the formwork the foundation of cultivation created and inserted the reinforcements.

Since the concrete pump is already on the 14.12. besellt, it was up to me as soon as possible, ie immediately, insert the conduits for electrical installations. At the same time Roger has brought by R. Niederer Flawil plumbing, including water and sewage pipes.



Saturday, December 8, 2007

Pokemon Ear Plug Gauge

digging, digging,

Today Saturday we dug, my father Bruno and I the diggings of the Kabefernsehen and buried Swiss Coman final (yes, yes, they are still the old lines ;-)). Ca. 30m1, 30cm wide and 50cm deep. Hard work! Conduit zubuddeln pure and again ... was glad that was closing time and we had a Basilea (ice) cold beer. At this point: Merci Bruno!

Thursday, December 6, 2007

Atrial Tach Difference

Done


did it, the old base was razed to the ground ...

Wednesday, December 5, 2007

Gratis Hindi Invitation Cards

's gas and water pipes

After I have the very short term Max Kunz, holyday muster core drilling the holes for the new house lead to drilling, we could now move the gas and water supply.















gas and water are already in place.
is now eingesandet the whole and filled with gravel to the top box core drilling ...










... where I had to move then the teacher tubes for cable TV, phone and the outside lights.

Monday, December 3, 2007

Games Off Skate Board

Now off you!

clock 08:00 Monday morning, finally it starts. Kurt and Marcel go on with your equipment.
up first site, then the "Wägli" widen to a reasonable width. Thus, Nef's can use their dump trucks and excavators "somewhat fuhrwerchen prudently in the upper part of the property.